Quality Commerce GA septic system installers do a number of legwork, long before a unit gets installed into the ground. A brand new unit will last years, and possibly even generations, if it’s placed the right way, but it can break down immediately if it’s not. Furthermore, all Commerce GA septic system installers must acquire a permit for them to execute the install, and may will have to coordinate with city or county officials to show that a number of tests were done in order to move on. These three assessments are essential primary steps that should always be taken before any work or designs are done, and it may also be helpful to do them before you buy a property, so you could be assured that a tank and leach field will be allowed.
1. Pit
The pit test is very straightforward. During the course of this test, a hole is dug down and the soil is inspected to determine its composition. A conventional leach field is dependent on the soil’s structure to drain efficiently. If there is a lot of gravel or sand, your leach field should be capable to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a bunch of clay or rock, it won’t drain well, and so a traditional leach field will not be an alternative. If the site you’ve chosen does not successfully pass the pit test, you may be able to pick another site on your home or use an alternate kind of drain field, like a mound system.
2. Perc
The perc, or percolation test, consists of excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then saturating it with water. The hole is generally left drenched for about two hours, and refilled as needed. After this, the hole is filled with 6 inches of water and observed for drainage.
3. Visual
There are many things an inspector will investigate visually. Many units are gravity-fed, so they don’t rely on electricity or pumps to move effluent from the tank to the leach field. Because of this, the incline of the ground is essential. An inspector will also look for slopes that could possibly feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Choose Quality Commerce GA Septic System Installers Now
Choosing the right configuration, kind of system, and assessing the land effectively, are all fundamental procedures in making sure an install goes off without a hitch. Most significantly, these steps ensure that the install is done correctly, so that a system provides years of use without issue. If you’re preparing for an install, call Septic Tank Pros Flowery Branch. Our specialists are knowledgeable and devoted to quality, so you can be sure the job is done right. Call (470) 798-3733 right now.