Quality Suwanee GA septic system installers do a lot of examination, long before a unit gets placed into the ground. A brand new unit will last decades, and possibly even generations, if it’s set up correctly, but it can malfunction immediately if it’s not. Furthermore, all Suwanee GA septic system installers must obtain a permit for them to execute the install, and may need to partner with city or county officials to show that specific tests were run in order to continue. These three assessments are necessary initial steps that should always be taken before any task or designs are done, and it may also be beneficial to perform them before you acquire a property, so you can be assured that a tank and leach field will be allowed.
1. Pit
The pit test is very straightforward. During the course of this test, a hole is dug and the soil is examined to figure out its structure. A standard leach field is dependent on the soil’s composition to drain effectively. If there is a bunch of gravel or sand, your leach field should be ready to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a considerable amount of clay or rock, it won’t sink well, and so a traditional leach field will not be an option. If the location you’ve picked does not successfully pass the pit test, you may be able to select another site on your house or use an alternate kind of drain field, like a mound system.
2. Perc
The perc, or percolation test, consists of digging a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then saturating it with water. The hole is normally left saturated for about two hours, and refilled as needed. Then, the hole is filled with 6 inches of water and observed for drainage.
3. Visual
There are several things an inspector will investigate visually. A lot of units are gravity-fed, so they don’t rely on electricity or pumps to move effluent from the tank to the leach field. As a result of this, the incline of the ground is vital. An inspector will also try to find slopes that can feed excess water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Work with Quality Suwanee GA Septic System Installers Today
Picking the right configuration, kind of system, and assessing the land properly, are all essential steps in making sure an install goes off without a hitch. Most importantly, these steps guarantee that the install is done correctly, so that a system provides many years of use without issue. If you’re prepping for an install, call Septic Tank Pros Flowery Branch. Our specialists are knowledgeable and devoted to quality, so you could be sure the job is done right. Call (470) 798-3733 today.