Quality Gainesville GA septic system installers do a great deal of legwork, long before a unit gets placed into the ground. A brand new unit will last many years, and possibly even generations, if it’s placed the right way, but it can fail right away if it’s not. Furthermore, all Gainesville GA septic system installers must obtain a permit for them to carry out the install, and may need to work with city or county officials to show that certain tests were done in order to move on. These three evaluations are important primary steps that should always be taken before any task or designs are done, and it may also be beneficial to do them before you acquire a property, so you could be assured that a tank and leach field will be allowed.
1. Pit
The pit test is very uncomplicated. During the course of this test, a hole is dug down and the soil is inspected to establish its composition. A conventional leach field is dependent on the soil’s composition to drain efficiently. If there is a considerable amount of gravel or sand, your leach field should be able to discharge the effluent (water) from the tank well, where the soil will finish sanitizing it. If the soil has a lot of clay or rock, it won’t sink well, and so a conventional leach field will not be an alternative. If the site you’ve chosen does not successfully pass the pit test, you may be able to select another site on your house or use an alternate kind of drain field, such as a mound system.
2. Perc
The perc, or percolation test, requires excavating a 14-inch deep hole, adding a 2-inch layer of sand or gravel, and then saturating it with water. The hole is normally left soaked for about two hours, and refilled as needed. After this, the hole is filled with 6 inches of water and monitored for drainage.
3. Visual
There are a variety of things an inspector will look into visually. A lot of units are gravity-fed, so they don’t depend on electricity or pumps to move effluent from the tank to the leach field. As a result of this, the slope of the ground is important. An inspector will also try to find inclines that could feed excessive water into the leach field, as well as nearby bodies of water, the water table, and distance from the proposed unit to things like the home and wells.
Enlist the Services of Quality Gainesville GA Septic System Installers Now
Selecting the right layout, type of system, and evaluating the land properly, are all integral procedures in making sure an install goes off without a hitch. Most importantly, these steps guarantee that the install is done correctly, so that a system provides decades of use without issue. If you’re preparing for an install, call Septic Tank Pros Flowery Branch. Our technicians are knowledgeable and committed to quality, so you can be sure the job is done right. Call (470) 798-3733 today.